The project’s most important challenge was to preserve and clean the removed bricks. For this purpose, a workshop was set up on site where bricks were recycled. Also, a working method was developed to give the building temporary waterproofing during the repair work.
- Replacement of facings
- Recycling of bricks
- Structural reinforcement
- Repair of expansion joints and stabilisation of facing
- Review of the building’s waterproofing.